Entity forming · Germany · Pipeline across the EU

Distributed AI compute,
built where the power is.

NeoPods develops and invests in approx. 100–300 kW micro data centers sited behind-the-meter at European industrial loads. We turn idle grid capacity into sovereign AI compute — in months, not years.

Pod Size 100–300 kW IT
Time to Power Months, not years
Geography DE · FR · ES · EU
Stage Pre-FID · Pipeline build
— The opportunity

Three constraints meet at the same site.

01
3–7 yr
Grid queue, major EU markets

New large-scale grid connections in Germany and across the EU take years to secure. AI demand will not wait. Sites with existing grid access are the fastest path to deployable compute.

02
>20 GW
Idle behind-the-meter capacity at EU industrials

European industrial power consumption has fallen from ~1,200 TWh/year at its 2008 peak to ~1,000 TWh/year today. That ~200 TWh delta implies more than 20 GW of energised industrial grid capacity sitting idle — already permitted, already connected, ready to host compute.

03
EU-sovereign
Demand for in-territory AI compute

Inference workloads, regulated industries, and European model labs require compute under EU jurisdiction. Distributed micro-DCs solve sovereignty and latency in the same footprint.

— Vision

Developing Europe's #1
AI compute network.

— What we deploy

The Pod. Modular. Site-flexible. Sovereign.

6.0 m · 20FT ISO POWER · 300 kW MV/LV · BTM feed COOLING Hybrid · free-cooling + DX GPU RACKS High-density · up to 100 kW/rack FIBRE Dual-path · low-latency

Each NeoPod is a factory-built, pre-engineered IT module delivered in the form factor the site demands — containerised for outdoor or yard deployment, or building-integrated where an existing hall or utility space is available. Pre-engineered for hybrid cooling and GPU-class density, deployable in weeks once power and site are confirmed.

IT Load 100 – 300 kW
Form Factor ISO container (20/40 ft) or building-integrated
Cooling Hybrid free-cooling + DX
Rack Density Up to 100 kW per rack
Power Source BTM industrial · grid · hybrid PPA
Deployment Weeks on-site · months to COD
Hardware Stack Nvidia · Lenovo · Vertiv · Siemens
— Who we want to work with

Three counterparties. One aligned deal.

Offtakers

AI compute buyers

Anchor capacity for neoclouds, hyperscaler overflow, European model labs, and inference platforms. Take-or-pay or capacity-reservation structures.

  • Hyperscalers · burst & overflow
  • Neoclouds · Lambda · Crusoe class
  • EU model labs · Mistral · Aleph Alpha
  • Regulated enterprise · sovereign workloads
Site Partners

Industrial hosts

Industrial operators and activity zones with unused grid headroom monetise the connection asset — long-term land lease plus optional equity in the SPV.

  • Manufacturing & process industry
  • Industrial parks · activity zones
  • Utilities · substation owners
  • Renewable asset owners · BTM PPA
Capital

Investors

Stage-gated capital deployment across sponsor equity, project debt, and strategic offtaker / site-owner co-investment. Infrastructure-style returns on contracted capacity.

  • Infrastructure funds · digital infra
  • Venture · pre-FID sponsor equity
  • Vendor & equipment finance
  • Strategic co-investors
— Get in touch

Building the pipeline.

NeoPods is forming. We are actively engaging with industrial site owners, compute offtakers, and capital partners for our first pods in Germany and adjacent EU markets.

If you operate an industrial site with spare grid capacity, need AI compute delivered fast in-territory, or invest in digital infrastructure — we want to talk.